Skip to main content

Posts

Showing posts with the label Karnan

Steering Gear Control

Steering Gear Control Steering Gear Control ◾Control for main steering gear should be provided from both navigation bridge and steering compartment. ◾In case of chemical tankers and gas carriers two independent hydraulic tele-motors shall be fitted. ◾Auxiliary steering gear shall be operated independently from the wheel house. ◾There should be two independent power supply for the control circuits, one from main switch board and one from emergency switch board. ◾If no emergency generator is there, then two independent connections to be fed to the controller circuits from port and starboard side of the main switch board, so that in case of fire, one can be isolated. ◾In case of failure of main steering gear, second one should start within 45 seconds. ◾Audio and visual alarms to be provided in wheel house for failure of power to the steering gear and control system. ◾Only short circuit protection to be provided on main supply and control system, by means of fuses. ...

Questions asked in COC

           Questions asked in COC 1. 2 gen same kw and amps r different, which gen power factor will be more ? 2. Garbage management plan duty of electrical officer ? 3. Co2 release procedure and what all things do before operating. 4. Man over board what is ur immediate action? 

Questions shared by Karnan(12-07-2017)

                                             Questions shared by Karnan(12-07-2017) Questions: 1.Explain the alarm circuit of navigational lights . 2. ESB fire 3. Brush less generator cross questions 4. MCP principle 5. Power factor  6. Air gap 1.how voltage is generated from alternator 2.what are the documents u will keep ready before electrical survey onboard 3.duties in fire and abandon ship drill 4.What is high voltage and its advantages 5.how to test AE LO low pressure alarm Surveyor: venugopal Result : pass What is neutral system onbord How the equipments are save guard from earth fault? High voltage safeties  Eme.gen starting proceedure Alternator megger test  ISM ISPS Why ETO coc  Mr.Venugopal